PERIOD \\ 2011 – 2021 CLIENTS \\ ENERPOINT ENERGY Ltd
RENEW-CO ENGINEERING Ltd
EXERGICA Ltd
PLAIN ENERGY ITALIA Ltd
Permitting technical services for the construction of 9 (nine) FV ground plants: support at public hearings, planning applications filing, planning requests defense, specialist consultancy, planning review, etc.. Client: Renew-co Engineering Ltd.
Environmental impact assessment (EIA) for the construction of a 9MWAC PV power plant in Emilia Romagna Region, named “Comacchio 1”, located in the Municipality of Comacchio (FE). Client: Renew-co Engineering Ltd.
Environmental impact assessment (EIA) for the construction of a 11MWAC PV power plant in Emilia Romagna Region, named “Volania 1”, located in the Municipality of Comacchio (FE). Client: Renew-co Engineering Ltd.
Environmental impact assessment (EIA) for the construction of a 8 MWAC PV power plant in Molise Region, named “Montenero”, located in the Municipality of Montenero di Bisaccia (CB). Client: Renew-co Engineering Ltd.
Environmental impact assessment (EIA) for the construction of a 46 MWAC PV power plant in Molise Region, named “Campomarino”, located in the Municipality of Campomarino (CB). Client: Renew-co Engineering Ltd.
Environmental impact assessment (EIA) for the construction of a 47,7MWAC PV power plant in Campania Region, named “Ariano Irpino”, located in the Municipality of Ariano Irpino (AV). Client: Renew-co Engineering Ltd.
Environmental impact assessment (EIA) for the construction of a 47,7MWAC PV power plant in Campania Region, named “Ariano Irpino”, located in the Municipality of Ariano Irpino (AV). Client: Renew-co Engineering Ltd.
Hydraulic Compatibility Assessment for the construction of a 4 MW FV power plant and its grid connection works located in Municipality of Taranto (TA). Client: Plain Energy Italia Ltd
Hydraulic Compatibility Assessment, geo-hydrological hazard evaluation on the analysis of hydro-geomorphological features of the Apulia stream basin, for the construction of a 1 MW FV power plant and its grid connection works located in Municipality of San Giorgio Ionico (TA). Favourable opinion obtained on 13/06/2012. Client: Enerpoint Energy Ltd